What a bank-ready feasibility study in Egypt actually includes

Most feasibility studies that come back from a bank are not rejected because the project is bad. They come back because the reader cannot follow how the numbers were reached, or because a question the lender always asks has no answer in the document. This guide sets out what a study needs to contain to get through a credit committee in Egypt or the Gulf, and what you can prepare to make it faster and cheaper.

Why studies get sent back

  • Demand is asserted, not evidenced. "The market is growing" with no source, no competitor pricing and no customer evidence.
  • Capex is a single line. Lenders want the build-up: land, construction, equipment, installation, pre-operating costs and contingency, ideally backed by quotations.
  • Financing is missing. The model shows project returns but never shows the loan drawdown, interest, repayments or whether cash covers debt service each year.
  • There is no bad case. One scenario, usually optimistic, and no view of what happens if sales start a year late or costs run over.
  • Currency is mixed. Revenues in EGP, imported equipment in USD and no treatment of exchange-rate movement between the two.

The nine parts of a study that holds up

1. Market and demand

Market size, growth drivers, the competitors a customer would actually compare you with and their prices. Every figure carries its source. Where public data is thin, primary evidence such as letters of intent, distributor interest or a short customer survey carries more weight than a generic industry report.

2. Technical and operating plan

Capacity, location, technology, suppliers, staffing and the ramp-up from first day to full output. Lenders look closely at ramp-up because that is where cash shortfalls happen.

3. Capex and opex build-up

Itemised investment cost with quotations where possible, a contingency line, and operating costs split into fixed and variable so break-even can be calculated.

4. Financing plan

Equity, debt and any grants or supplier credit, with the drawdown schedule, grace period, interest rate and repayment profile. This section answers the question the lender is really asking: how and when do we get repaid?

5. Integrated financial model

A three-statement model, income statement, balance sheet and cash flow, that balances in every period. During construction and early operations, monthly or quarterly periods show cash needs that annual figures hide.

6. Returns

NPV, IRR and payback at project level and at equity level, plus the debt service coverage ratio (DSCR) for each year of the loan. Ask your bank early what minimum DSCR it applies; it differs by lender and sector.

7. Sensitivities and scenarios

What happens to returns and debt coverage if price drops, volume is slower, costs rise or the exchange rate moves. A simple table showing which variable breaks the project first is one of the most useful pages in the study.

8. Regulatory and licensing

Licences, permits, land allocation terms, incentives and the timeline to obtain them. A project that is profitable but cannot be licensed on time is not feasible.

9. Risk register

The main risks, their likelihood and impact, and what mitigates each one. A heat map makes this readable at a glance.

On currency: model each revenue and cost line in the currency it is actually paid in, then convert. Show headline results in both EGP and USD so a foreign-currency lender or investor can read them without redoing your work.

What to prepare before you commission a study

  • A one-page description of the project and the decision the study must support
  • Who will read it: which bank, fund or authority, and whether they have a required template
  • Any quotations, land documents, offers or contracts you already hold
  • Your own cost and price assumptions, even rough ones, so they can be tested
  • How much equity you can commit and how much financing you are seeking

With these in hand, a typical study takes three to six weeks rather than two or three months.

How much a study costs

Cost depends on project size, how much data exists and who the study is for. An internal go or no-go study needs less depth than one going to a development-finance institution. A fair provider will give you a fixed fee in writing after a short scoping call and tell you upfront what they need from you.

Need this done for your project?

Book a free 30-minute call. You get a written scope and fixed fee within 48 hours.

Book a free call on WhatsApp